All Posts By

VectorCSP

There’s More to Our Story: Welcome to the VectorCSP Blog

By | Blog Posts | No Comments

By: Stan Walz, VectorCSP CEO; Janis Nagy, VectorCSP COO; and Damien Walz, Vice President of Business Development Before we had a name for what is now VectorCSP, the founding members of the company had many more discussions about what the company’s values would be, as opposed to what it would actually do.  We wanted it to be a better company than those we saw around us; in those days we were mostly observing firms supporting Coast Guard aviation at the Aircraft Repair and Supply Center (AR&SC), which has subsequently become the Coast Guard’s Aviation Logistics Center (ALC).  The values that…

Read More

VectorCSP Team Wins HM&E Support Contract at SFLC

By | News & Events | No Comments

VectorCSP and Insight Technology Solutions have teamed to win a logistics support recompete contract at the Surface Forces Logistic Center (SFLC) Long Range Enforcer Product Line (LREPL). We will continue to provide hull, mechanical and electrical (HM&E) configuration data management, provisioning, maintenance, and logistics analysis support to 282’ WMEC, 378’ WHEC, 399’ WAGB, 418’ WMSL and 420’ WAGB Cutters.

Read More

VectorCSP Team Wins USCG MH-60 Contract

By | News & Events | No Comments

VectorCSP, CSE, and VLinc have teamed to win the USCG Aviation Logistics Center MH-60 Maintenance and Navy Conversion Project contract. This support is centered on engineering, technical, and logistics services for the development, production and delivery of Time Compliance Technical Orders, aviation engineering consultation, and logistical planning.

Read More

VectorCSP Awarded U.S. Army Reserve Contract

By | News & Events | No Comments

VectorCSP was awarded a contract to perform a study and analysis of the Watercraft Maintenance program for the U.S. Army Reserve (USAR) at Pier 23 in Tacoma, Washington in support of the Area Maintenance Support Activity (AMSA) 137. The objective of this study and analysis is to identify and perform operational gap analysis, process improvements identification, and resource requirements and labor analysis to support the mission.

Read More

VectorCSP Wins Task Order To Provide SFLC Training

By | News & Events | No Comments

VectorCSP partnered with BMT Designers & Planners to win a task order with the U.S. Coast Guard’s Surface Forces Logistics Center (SFLC) Program Depot Maintenance (PDM) Port Engineer (PE) and Availability Project Manager (APM) Training Program. Our team will be responsible for conducting, maintaining, facilitating, and coordinating the courses that fall under the PE & APM course curriculum.

Read More

VectorCSP HC-27J MPC Development Project gets high marks

By | News & Events | No Comments

A ten-member team of aviation technical experts tackled a task to develop Maintenance Procedure Cards (MPC) for a fleet of 14 HC-27J aircraft that the Coast Guard acquired from the Air Force in the summer of 2014. The Aviation Logistics Center (ALC) HC-27J Asset Project Office in Elizabeth City was charged with developing an Integrated Logistics System to support delivery of the aircraft to USCG Air Station Sacramento to support Initial Operating Capability in the summer of 2016.

Read More